Start here · about 10 minutes

Take the systems exam to open your planner

Twenty yes-or-no questions on how the company runs today. Your answers set the score, the profit at stake, and the first steps, and then the planner opens with a worked sample you can make your own. Until then, read the overview below and the method.

Take the exam Read the method

  1. Answer 20 questionsAbout ten minutes, no numbers needed
  2. See your scoreAgainst firms your size, with the dollars at stake
  3. Build your planVolume, overhead, markup, backlog, bids, incentive
Aecoris · ROOI

Garber Bros. Precision Concrete Inc.

The 2026 plan, as of 2026-11-10. Price the work, carry the overhead, and see the return that investment produces.

Return on overhead
70.1%
Pretax $940,606 on overhead $1,340,894. The planning band is 40%–48%.
Sales
$8,450,000
65,000 field hours · $130 / hour
Gross margin
$2,281,500
27.0% of sales
Break-even
$4,966,274
Overhead ÷ gross margin rate
Monthly capital
$664,876
At 90% material and labor risk
Sales demand
$9,835,718
1,140 bids from the crew you have
Maximum backlog
$2,309,949
Minimum to break even $1,166,345
Superintendents
5.00
9.21 required · gap -4.21
Awards vs pace
−$4,549,912
$3,911,500 won of $8,461,412 pace · bid log
$0$15M$30M$45M$60MJanFebMarAprMayJunJulAugSepOctNovDec Bid, actualBid, planAwarded, actualAwarded, plan
Bid logBids and awards to date against the plan Dashed lines are the plan spread by the budget's month weights. Solid lines are the bids you have logged. The shaded month is the plan's as-of month.

The planning sequence

0 of 12 steps done · Next: Systems exam

1 · Systems exam

Twenty questions on whether the company is ready for the volume it has.

2 · Volume 🔒 After the exam

Level III price, Level II overhead, Level I return.

3 · Job mix 🔒 After the exam

Size bands, time to estimate, months in the field, capture.

4 · Capacity 🔒 After the exam

Where the week actually goes, and how many bids that supports.

5 · Backlog 🔒 After the exam

How much work to hold, how many superintendents, how much cash.

6 · Budget 🔒 After the exam

The overhead investment, spread across the year.

7 · Sales 🔒 After the exam

Bid, award, gross profit, and hours against this year's pace.

8 · Bid log 🔒 After the exam

Every bid and award, month by month, against the plan's goals.

9 · Bid strategy 🔒 After the exam

Whether the next bid should be tighter, the same, or higher.

10 · Incentive 🔒 After the exam

A salary-based bonus that turns on only after the return clears its mark.

11 · Business plan 🔒 After the exam

The whole year, in language you can print.

12 · Team exam 🔒 After the exam

Your managers answer the same questions. Where you split is the agenda.

Start with why the plan is built this way

ROOI
The Aecoris suite

From the plan to every day

ROOI is the free planning piece of Aecoris. A plan only works if the numbers come back, and PayCrew and CraftBelt bring them back every day: hours, quantity, and cost against the estimate, from the field to the owner.

PayCrew

PayCrew

Measure the day. See the profit.

The office side: daily production against the estimate, payroll-ready time, and the owner's reports, read from the accounting system you already run.

  • Payroll ApprovalsThe week by job, cost code, and person. Approve a whole job day at once. Payroll-ready time goes back to your books.
  • Premium SchedulePlan each crew by job and cost code, with plan hours against actual hours and the goal quantity against the estimate.
  • Live ProductionHours and quantity from posted payroll plus this week's open tickets, against the estimate. No waiting for last month's export.
  • DeltaDriftOne cost history for every estimator: what each cost code really took on past jobs. Two estimators pricing the same work get the same rate.
  • ProfitPaceIncentive pools funded by hours saved against the estimate. Overruns take from the pool the same way.
  • MarginManifestThe owner's scorecard: hours entered on time, approvals on time, and margin by job, measured every day.
  • SafetyIncident log, company policies, and OSHA 300, 300A, and 301 forms filled from recordable cases and hours worked.
  • Your accounting systemFoundation and Viewpoint today. Jobs, phases, cost codes, and people come from the books you already keep.
See PayCrew
CraftBelt

CraftBelt

The day gets measured where it happens.

The field side: crews enter hours and quantity on the phone against the job and cost code, and the foreman approves the same day.

  • Time DeskEnter hours against the job and cost code, or clock in and out. Total hours or Reg, OT, and DT, the way your company pays.
  • Same-day approvalsThe foreman approves the crew's time the same day, a whole job day in one tap or one person at a time.
  • Job SheetsQuantity placed, work performed, notes, photos, and your own fields, by cost code on the same screen as approvals.
  • Schedule AheadForemen and superintendents plan crews for the days ahead on the same schedule the office sees in PayCrew.
  • ProductionHours and quantity against the estimate, green when the crew is ahead and red when it is behind.
  • PassPortA worker's trade history and certifications that travel with the worker from job to job.
  • Forms and trainingAnnouncements, quizzes, and short walkthrough videos right on the page where the crew works.
See CraftBelt
Lee Clark

Built by a contractor. Lee Clark owned a concrete company of 250+ people and has written contractor software since 1993. Aecoris also builds custom software for contractors who need something we do not have yet.